File #: 19-0704    Version: 1 Name:
Type: Contract Status: Committee Approval
File created: 6/6/2019 In control: Clipper Executive Board
On agenda: 6/17/2019 Final action:
Title: Proposal to Modify the Next Generation Clipper System Integrator Scope of Work Related to Faster Load Times (Accelerated C2 System Deployment) Request approval from Board members to direct Cubic, as the Next Generation Clipper System Integrator, to modify the scope of work related to enabling faster load times at select devices.
Attachments: 1. 3d_Proposed Change to C2 SI SOW_rev.pdf

Subject:

Title

Proposal to Modify the Next Generation Clipper System Integrator Scope of Work Related to Faster Load Times (Accelerated C2 System Deployment)

 

Request approval from Board members to direct Cubic, as the Next Generation Clipper System Integrator, to modify the scope of work related to enabling faster load times at select devices.

 

Body

 

Presenter:

Presenter

Edward Meng

 

Body

Recommended Action:

Action

Board Approval

 

Body

Attachments: